The figures on this page assume a dedicated 32 A circuit. Choose your grid type and main fuse, and we'll work out what XPENG G9 AWD Performance (2023–2025) actually gives in your home.
Best chargers for XPENG G9 AWD Performance (2023–2025)
Ranked by actual charging speed first, then price.
Questions about charging the XPENG G9 AWD Performance
Can the XPENG G9 AWD Performance charge on 3-phase on an IT grid?
No. The XPENG G9 AWD Performance only charges on 1 phase on a 230V IT grid, whichever charger you have. The maximum there is 7.4 kW. On a TN grid (400V) it charges on 3 phases at up to 11 kW.
How long does the XPENG G9 AWD Performance take to charge at home?
With 93.1 kWh of usable battery capacity, it takes about 8 h 23 min from 10 to 100% on a TN grid (11 kW) and about 12 h 27 min on an IT grid (7.4 kW), with a charger that gives full speed. From an ordinary household socket (about 2.3 kW) it takes about 40 h 4 min.
Which home charger is best for the XPENG G9 AWD Performance?
Easee Charge Up is the cheapest charger that gives full speed on both IT grids (7.4 kW) and TN grids (11 kW), from NOK 6,499. In total, 8 chargers with a known price give the same speed. Since the XPENG G9 AWD Performance charges on 1 phase on an IT grid anyway, there's no need to pay extra for a charger with IT 3-phase support.
How fast does the XPENG G9 AWD Performance charge on a 16 A circuit?
The figures above assume a 32 A circuit. With 16 A, the maximum is 3.7 kW on 1 phase and 11 kW on 3 phases on a TN grid. The main fuse and other loads in the house can also limit charging – ask your electrician what your home can handle.