How we calculate the charging speed
Laderguiden shows how fast 1128 EVs charge with 14 home chargers on Norwegian grids. Here is exactly how the figures are produced, and where the data comes from.
The weakest link decides
Home charging speed is limited by both the car's on-board charger and the wallbox. For every combination we work out the result for both grid types:
- TN grid (400V): If both the car and the charger use 3 phases, the speed is the lower of the car's and the charger's maximum power. If either only uses 1 phase, charging is 1-phase and the lower 1-phase power applies.
- IT grid (230V): The charger must first be approved for IT grids – otherwise we show "Not compatible". You only get 3 phases if both the car and the charger support 3-phase on an IT grid, and then the lower of the two applies. In every other case, it's 1 phase.
- Bottleneck: We show which side is the limit, so you can see whether another charger would help.
Read more about why IT grids are special in the guide to charging on an IT grid.
Charging time
Charging time from 10 to 100% = usable battery capacity × 0.9 × 1.1 ÷ charging power. The factor 1.1 covers about 10% charging loss. In practice the last few percent go slower, and cold weather can lower the power, so treat the time as an estimate.
Assumptions
- The charger is installed on a 32 A circuit and set up for full current. With 16 A, 1 phase gives at most 3.7 kW, 3 phases on an IT grid at most 6.4 kW, and 3 phases on a TN grid at most 11 kW.
- The main fuse and load balancing in your home can limit the speed further. Enter your values under "My home", and we include them (see below).
- We use the car's standard on-board charger. Some models can be ordered with a faster charger as an option.
- Model years with identical specs are merged into one page, for example "2021–2023".
In your home: supply and fuses
Under "My home" at the top of the page you can enter your grid type, supply, main fuse and, if you have one, your charging circuit. It's only stored in your browser. We then calculate like this, on top of the car and charger:
- 1-phase supply: Charging is always 1-phase, whatever the car and charger.
- Charging circuit: If you have a dedicated circuit for the charger, the charger can use its current, for example 16 A.
- Main fuse: Without a charging circuit, we assume the charger can use 60% of the main fuse, at most 32 A. The rest is for the rest of the house. With a 40 A main fuse that's 24 A, which gives 9.6 kW on 3 phases on an IT grid and 16.6 kW on a TN grid. We assume the charger has load balancing, as almost all do. It then turns down when the house uses a lot of power, and can give more when the house uses little, for example at night.
- Power: 1 phase = 230 V × current. 3 phases on an IT grid = √3 × 230 V × current. 3 phases on a TN grid = 3 × 230 V × current.
Your best buy is the cheapest of the chargers that charge your car fastest in your home. If your home is the limit, a more expensive charger often adds nothing.
Sources
- Home chargers: the manufacturers' datasheets and installation manuals. Each charger's page links to its datasheet.
- EVs: model list, battery and maximum AC power from EV Database; number of phases from OpenEV Data (CDLA-Permissive-2.0); 1-phase power and IT 3-phase support from owner's manuals, manufacturers and the charging tables of Norwegian dealers.
- When the manufacturer says nothing about IT 3-phase, we assume the car charges on 1 phase on an IT grid. It's the safe choice: at worst the car charges faster than we show, never slower.
- Prices: the lowest price on Prisjakt, updated daily. The date is on each charger's page.
- Images: charger images from the manufacturers; car photos from Wikimedia Commons with the photographer and licence below the photo.
About Laderguiden
Laderguiden is an independent Norwegian service built to answer one question: how fast does exactly your car charge with exactly your charger, on exactly your grid? The ranking of chargers is based only on charging speed and price. Read about ads and affiliate links, andwho runs the site.
The figures are a guide. A charger must always be installed by a registered electrical contractor, who can assess what your installation can handle.