Many Norwegian homes have a 230V IT grid. There, most EVs charge on just one phase – even with an expensive 3-phase charger. This guide explains why, and what you actually get.

What's the difference between an IT grid and a TN grid?

The supply into your home has three phases. The difference is the voltage, and whether there is a neutral conductor:

  • TN grid (400V): 400 volts between phases and 230 volts between phase and neutral. This is standard in the rest of Europe and in newer Norwegian homes. EVs and chargers are designed for it.
  • IT grid (230V): 230 volts between phases and no neutral. It's common in Norway, especially in older homes. A 1-phase charger is connected between two phases here.

How do I know which grid I have?

  • Look in your fuse box: if it says 400V (or 3×400/230V), you have a TN grid. If it says 230V (3×230V), it's usually an IT grid.
  • Ask your grid company (nettselskap) – they know which grid is in your area.
  • Ask the electrician who will install the charger. Don't measure the voltage yourself.

How fast can you charge on an IT grid?

The maximum power from the circuit, before the car or the charger limits it. Because there are only 230 volts between phases, 3 phases on an IT grid give far less than on a TN grid.

CircuitIT 230VTN 400V
1 phase, 16 A3.7 kW3.7 kW
1 phase, 32 A7.4 kW7.4 kW
3 phases, 16 A6.4 kW11 kW
3 phases, 32 A12.7 kW22 kW

The car's on-board charger is often the limit: most EVs take at most 11 kW, and some only 7.4 kW or less on 1 phase.

Why must both the car and the charger support IT 3-phase?

The charging standard (Type 2) is designed for TN grids. To charge on 3 phases on an IT grid, the charger must be able to deliver 3 phases without a neutral, and the car's on-board charger must be able to accept them. If either one doesn't support it, charging falls back to 1 phase. That's why we always show the result for the combination of car and charger, not just for each on its own.

EVs that support 3-phase on an IT grid

Of the 236 models we cover, only these do, according to the manufacturers and the sources we have found:

All others charge on 1 phase on an IT grid. See each car's page for its maximum on 1 phase.

Home chargers and IT grids

Prices, cables and the cheapest charger for your car: see which home charger to choose for an IT grid.

Is 1 phase enough?

For most people, yes. At 7.4 kW for 8 hours overnight, around 54 kWh goes into the battery after about 10% charging loss – roughly 270 km at a consumption of 2 kWh per 10 km. That covers far more than normal daily driving. 3-phase charging helps most if you drive very long distances every day, or can only charge for a few hours.

Safety and installation

  • The charger must be installed by a registered electrical contractor.
  • The manufacturer must approve the charger for IT grids. Some chargers are only made for TN and TT grids and can't be used on an IT grid at all.
  • The installation needs protection against DC fault currents (6 mA DC), either built into the charger or as a type B RCD. We list this on each charger's page.
  • DSB (the Norwegian Directorate for Civil Protection) has warned against 3-phase charging on IT grids with equipment that isn't designed for it. Only use 3 phases when both the car and the charger support it.

Can I switch from an IT grid to a TN grid?

Your grid company decides which grid is in your area. In many places the grid is gradually being converted to TN, but a switch also requires work on your home's electrical installation. Ask your grid company whether there are plans where you live before you invest in extra 3-phase equipment.